Seguimiento

Sampling of water in Pilot Zone. GPR. Device installation

In November 2013, water samples were taken in the Zone E, with the aim of establishing the preoperational level in this area.

In all the boreholes on the site of La CLICA water table depth was measured, later this information was included to the GIS database of Bioxisoil.

The November 20, 2013 a first exploration with the geophysics technique of GPR was made in La CLICA, in order to check if changes resistivity terrain detected with GPR are related to pollution levels detected in the laboratory analysis.

During this week we proceeded to the installation of automated injection device.